Asbestos Contracting

There are different types of services available for the removal of asbestos. Property owners should become familiar with these services when looking for an asbestos contractor.

If asbestos is found after an inspection, you may choose to ask the inspector for further assistance in planning the abatement. The inspector may assist you by making contacts with abatement contractors. A project designer can design the abatement that a contractor would follow, or the abatement company can put together work specifications. As the building owner, you may choose to hire either a project designer or an abatement contractor.

A project monitor can also be hired for oversight of the abatement contractor, but must conduct the final visual and air clearance required to determine if the area meets the state regulations for clearance. A project monitor cannot be an employee of the abatement contractor.
Obtain at least three bids from consultants and contractors. The inspector/project designer consultant can help you with bids and hiring of the project monitor. You may choose to have the consultant do all the coordinating for the project, or do the hiring yourself, which may reduce any conflict of interest issues.

Ask the contractor or consultant to provide you with a written proposal that includes a description of what they will do, the content of the final report, a schedule and a budget.

Asbestos New York provides a complete asbestos management solution encompassing asbestos removal, encapsulation,surveys, including refurbishment and demolition, and inspections within a fully controlled quality management system. We use a tablet based, data collection system that drastically reduces the time it traditionally takes to complete a full, end-to-end, asbestos survey. The Kershaw surveyor works through a structured, systematic process to collect the data, and the client’s final report is auto built as the survey progresses.

Using the new system, we can confidently say that we have more than halved the time it takes to complete a full asbestos survey, reducing the duration down to 3-4 days. http www.sws.org reportwriting-card-comments-for-esl-students We then create a management plan for addressing the findings, which you can easily share with the people who enter, manage or work on the building structure, and assist you in dealing with any issues highlighted in the report..